| |
| Figure 1-1 SPARCcluster HA Server Block Diagram Based on SPARCserver 1000 | 1-3 |
| Figure 1-2 SPARCcluster HA Server Block Diagram Based on SPARCcenter 2000 | 1-4 |
| Figure 1-3 SPARCcluster 1000HA Server Cabinet | 1-5 |
| Figure 1-4 SPARCcluster 2000HA Server Cabinets | 1-6 |
| Figure 2-1 Takeover Troubleshooting Flow Diagram | 2-3 |
| Figure 3-1 Both Nodes Have Errors on Same SPARCstorage Array | 3-3 |
| Figure 3-2 Multiple Disk Errors One Node Only | 3-4 |
| Figure 3-3 LCD Display | 3-6 |
| Figure 3-4 Private Net 0 Failure | 3-18 |
| Figure 3-5 Private Net 0 Troubleshooting | 3-19 |
| Figure 3-6 Private Net 0 Troubleshooting Continued | 3-20 |
| Figure 3-7 Indicator Locations | 3-21 |
| Figure 3-8 Troubleshooting Flow Diagram Overview | 3-23 |
| Figure 3-9 Branch A: Telnet to Terminal Concentrator Does Not Succeed 3-24 |
| |
| Figure 3-10 Branch A1: Terminal Concentrator Doesn't Respond to Ping Command | 3-25 |
| Figure 3-11 Branch B: Terminal Concentrator Can't Connect to a Node | 3-26 |
| Figure 3-12 Branch B.1: Single Node Not Responding | 3-27 |
| Figure 7-1 Key Switch Positions | 7-2 |
| Figure 7-2 AC Distribution Unit Power Switch | 7-3 |
| Figure 7-3 Key Switch Positions | 7-5 |
| Figure 7-4 Processor AC Power Switch and Plug | 7-5 |
| Figure 7-5 Reset Switch and Front Panel Status LEDs | 7-7 |
| Figure 7-6 SPARCstorage AC Power Switch and AC Plug | 7-9 |
| Figure 7-7 LCD Display While Powering On the System | 7-10 |
| Figure 7-8 Terminal Concentrator (Rear View) | 7-11 |
| Figure 7-9 Key Switch Positions (Cabinet Front View) | 7-12 |
| Figure 7-10 AC Distribution Unit Power Switch (Cabinet Rear View) | 7-13 |
| Figure 7-11 Local/Remote Switch Location | 7-15 |
| Figure 7-12 System Reset Switch | 7-16 |
| Figure 7-13 Power Supply Cable Location | 7-18 |
| Figure 8-1 Rear Screen Panel Removal and Replacement | 8-2 |
| Figure 8-2 Removing the Vented Panels | 8-3 |
| Figure 8-3 Opening the Hinged Door -- System Cabinet | 8-5 |
| Figure 8-4 Removing the Vented Panels | 8-6 |
| Figure 8-5 Rear Screen Panel Removal | 8-7 |
| Figure 8-6 Removing the Side Panels | 8-8 |
| Figure 8-7 Removing the Kick Panel | 8-9 |
| Figure 8-8 Stabilizer Bar | 8-10 |
| |
| Figure 9-1 Blower Assembly Removal/Replacement | 9-4 |
| Figure 9-2 Removing Terminal Concentrator Screws | 9-5 |
| Figure 9-3 Swinging Terminal Concentrator Out of Cabinet | 9-6 |
| Figure 9-4 Removing/Replacing Terminal Concentrator Cabling | 9-6 |
| Figure 9-5 Terminal Concentrator Mounting Detail | 9-7 |
| Figure 9-6 Boot Disk Removal/Replacement | 9-10 |
| Figure 9-7 Terminal Concentrator Removal/Replacement | 9-12 |
| Figure 10-1 SPARCcluster 1000HA Server | 10-3 |
| Figure 10-2 SPARCcluster 2000HA Server | 10-5 |
| Figure B-1 Serial Port RJ-45 Receptacle | B-2 |
| Figure B-2 15-pin Ethernet Receptacle | B-3 |
| Figure B-3 Twisted Pair Ethernet RJ-45 Receptacle | B-4 |