Skip to Content
Sun and Oracle
Channel Sun
How to Buy
Log In
English
docs.sun.com Home
>
High Availability AnswerBook
> SPARCcluster HA Server Hardware Planning and Installation
SPARCcluster HA Server Hardware Planning and Installation
Search only this book
Search Help
Contained Within
High Availability AnswerBook
Find More Documentation
Browse Documentation Titles
Browse Product Documentation
Featured Support Resources
Sun Training Courses
BigAdmin System Admininstration Portal
Sun Support Center
Sun Solve
Download this book in PDF (1609 KB)
SPARCcluster HA Server Hardware Planning and Installation
Cover
Credits
Contents
Figures
Tables
Preface
Part 1 - Site Preparation and Planning
1 Checklist
1.1 SPARCcluster 1000 High Availability System-- Factory-Assembled
1.2 SPARCcluster 1000 High Availability System-- Customer-Assembled
1.3 SPARCcluster 2000 High Availability System -- Factory-Assembled
1.4 SPARCcluster 2000 High Availability System -- Customer-Assembled
2 Product Description
2.1 Features
2.2 SPARCcluster 1000 High Availability Server Configuration
2.3 SPARCcluster 2000 High Availability Server Configuration
3 Specifications
3.1 Physical Specifications
3.2 Electrical Specifications
3.3 Environmental Specifications
4 Site Preparation and Planning
4.1 Planning Floor Space
4.2 Power Requirements and Options
4.3 Ethernet Networks
4.4 Coaxial Ethernet Cabling
5 SPARCcluster 1000 High Availability Configurations
5.1 Minimum Configuration
5.2 Expansion
5.3 Maximum Configuration
5.4 System Component Cabling
6 SPARCcluster 2000 High Availability Configurations
6.1 Minimum Configuration
6.2 Expansion
6.3 Maximum Configuration
6.4 System Component Cabling
Part 2 - Hardware Installation
7 Powering Off and On
7.1 SPARCcluster 1000 High Availability Server
7.2 SPARCcluster 2000 High Availability Server
7.3 Powering On the Server/Storage Chassis
7.4 Reading POST Messages and Boot Messages
8 Access
8.1 Removing System and Expansion Cabinet Panels
8.2 Leveling the Cabinets
8.3 Side Panel Removal
9 SPARCcluster 1000 High Availability Hardware Installation
9.1 Factory-Assembled SPARCcluster 1000 High Availability Hardware
9.2 Customer-Assembled SPARCcluster 1000 High Availability Hardware
9.3 Closing the Cabinet
10 SPARCcluster 2000 High Availability Server Hardware Installation
10.1 Factory-Assembled SPARCcluster 2000 High Availability Hardware
10.2 Customer-Assembled SPARCcluster 2000 High Availability Hardware
10.3 Closing the Cabinet
Part 3 - Software Installation
11 Installing the Software
11.1 Configuring the Terminal Concentrator
11.2 Checkpoint to Verify Terminal Concentrator Setup
11.3 Setting the Port Parameters
11.4 SPARCcluster Acceptance Test
11.5 What's Next
Part 4 - Appendix and Index
A Air Baffle, Rack Mount Rail and Blower Assembly Installation
A.1 Installing the Air Baffles
A.2 Rack Mount Rail Installation
A.3 Chassis Installation Positions
A.4 Installing the Side Rails
A.5 Preparing the Server and SPARCstorage Array Chassis
A.6 Installing the Base Plate on the Server or
A.7 Installing the Chassis in the Cabinet
A.8 Installing the Blower Assemblies
Glossary
Index
Revision History
creditsFrench
zz-card
News Center
About Sun
Contact Sun
Terms of Use
Privacy
Copyright
1994-2009
Sun Microsystems, Inc.