Index
A
| |
| AC power switch |
| .....cabinet | 9-2, 9-5, 10-3, 10-6 |
| adjust, levelling pads | 8-5 |
B
| |
| blower assembly, install | A-20 |
| boot messages | 7-8 |
| bottom panel, chassis remove | A-15 |
C
| |
| cabinet |
| .....AC power switch | 7-3, 9-2, 9-5, 10-4 |
| .....install |
| ............blower assembly | A-20 |
| ............chassis in | A-17 |
| ............side rails | A-7 |
| .....key switch | 7-2, 9-1, 9-4, 10-2 |
| cable |
| .....length | 4-6 |
| .....Sun private net | 5-5, 6-5, 9-19, 10-23 |
| .....system components | 9-14 |
| card cage |
| .....population |
| ............full | 5-4, 6-4 |
| ............minimum | 5-2, 6-3 |
| ............SBus cards | 9-14, 10-19 |
| chassis |
| .....install |
| ............base plate | A-16 |
| ............in cabinet | A-17 |
| .....key switch | A-9 |
| .....power on procedures | 7-7 |
| commands |
| .....addr | 11-4 |
| .....image | 11-5 |
| .....ping | 11-6 |
| .....seq | 11-5 |
| configuration |
| .....SPARCcluster 1000 HighAvailability | 5-1 |
| ............maximum | 5-3 |
| ............minimum | 5-2 |
| .....SPARCcluster 2000 HighAvailability | 6-1 |
| ............maximum | 6-4 |
| ............minimum | 6-2 |
| configuring |
| .....customer-assembled system |
| ............SPARCcluster 1000 HA | 9-3 |
| ............SPARCcluster 2000 HA | 10-5 |
| .....factory-assembled system |
| ............SPARCcluster 1000 HA | 9-1 |
| ............SPARCcluster 2000 HA | 10-1 |
| .....terminal concentrator | 11-1 |
D
| |
| disk drive |
| .....caution | 7-4, 7-7 |
E
| |
| Ethernet cable |
| .....Sun private net | 5-5, 6-5, 9-19, 10-23 |
F
| |
| factory-assembled system |
| .....SPARCcluster 1000 HA | 9-1 |
| .....SPARCcluster 2000 HA | 10-1 |
| front panel |
| .....chassis |
| ............remove | A-9 |
H
| |
| height adjust, levelling pads | 8-5 |
| hinged door | 8-2 |
| hole numbers |
| .....boot disks | 10-14 |
| .....side rails | A-4, A-5, A-7 |
| .....terminal concentrator | 9-9, 10-10 |
| host |
| .....SPARCcluster 1000 HighAvailability | 5-2, A-4, A-7 |
| .....SPARCcluster 2000 HighAvailability | 6-2, 10-14, A-5 |
I
| |
| install |
| .....base plate on the chassis | A-16 |
| .....blower assembly | A-20 |
| .....chassis in the cabinet | A-17 |
| .....side rails in the cabinet | A-7 |
| IP address, setting | 11-4 |
K
| |
| key switch |
| .....cabinet | 7-2, 9-1, 9-4, 10-2 |
| ......chassis | A-9, A-10 |
| ......label, install | A-10 |
| kick panelSee panel, remove, kick |
L
| |
| label |
| ......fiber optic cables | 9-21, 10-26 |
| ......key switch icon | A-10 |
| LEDs |
| ......terminal concentrator | 11-3 |
| leveling pads, adjust | 8-5 |
O
| |
| outer coversSee panel, remove |
P
| |
| panel |
| ......remove |
| ............hinged front, open | 8-2 |
| ............kick | 8-5 |
| ............rear screen | 8-4 |
| ............side | 8-8 |
| ......replace |
| ............kick | 8-5 |
| ............rear screen | 8-4 |
| ............side | 8-9 |
| panel, chassis |
| ......remove |
| ............bottom | A-15 |
| ............front | A-9 |
| ............side | A-11 |
| ............top | A-12 |
| popouts, top panel |
| ......remove | A-12 |
| ......replace | A-14 |
| population |
| ......system boards |
| ............full | 5-4, 6-4 |
| ............minimum | 5-2, 6-3 |
| ............SBus cards | 9-14, 10-19 |
| POST messages | 7-8 |
| power |
| |
| .....cabinet AC switch | 7-3, 9-2, 9-5, 10-4 |
| .....chassis |
| ............on | 7-7 |
| .....off |
| ............SPARCcluster 1000HA | 7-1 |
| ............SPARCcluster 2000HA | 7-4 |
| .....on |
| ............SPARCcluster 1000HA | 7-3 |
| ............SPARCcluster 2000HA | 7-6 |
| .....requirements | 4-4 |
R
| |
| rails, install | A-7 |
| .....base plate on chassis | A-16 |
| rear screen panelSee panel, remove |
| reboot |
| .....terminal concentrator | 11-5 |
| remove |
| .....chassis panel |
| ............bottom | A-15 |
| ............front | A-9 |
| ............side | A-11 |
| ............top | A-12 |
| ...................popouts | A-12 |
| .....panel |
| ............hinged front, open | 8-2 |
| ............rear screen | 8-4 |
| ............side | 8-8 |
| ............vented front | 8-2 |
| replace |
| .....chassis, top panel popouts | A-14 |
| .....panel |
| ............kick | 8-5 |
| ............rear screen | 8-4 |
| ............side | 8-9 |
| ............vented front | 8-4 |
| requirements, power | 4-4 |
S
| |
| server/disk array chassis See chassis |
| set, on terminal concentrator |
| .....IP address | 11-4 |
| .....network address | 11-4 |
| ......subnet mask | 11-4 |
| shut down |
| ......SPARCcluster 1000HA | 7-1 |
| ......SPARCcluster 2000HA | 7-4 |
| side panels |
| ......chassis |
| ............remove | A-11 |
| side panelsSee panel, remove |
| side rails |
| ......hole numbers | A-4, A-5, A-7 |
| ......install | A-7 |
| site preparation | 4-1 |
| Solstice DiskSuite |
| ......introduction | 2-1 |
| Solstice HA |
| ......introduction | 2-1 |
| ......online serviceability | 2-2 |
| Solstice HA data services | 2-1 |
| Solstice HA features | 2-2 |
| SPARCcluster 1000PDB |
| ......configurations | 2-5 |
| SPARCcluster 2000PDB |
| ......configurations | 2-6 |
| specifications |
| ......environmental | 3-1 |
| ......temperature | 3-1, 3-7 |
| stabilizer bar, adjust | 8-5 |
| Sun private net cable | 5-5, 6-5, 9-19, 10-23 |
| switch |
| ......key |
| ............cabinet | 7-4, 7-6, 7-7 |
| ............chassis | A-9 |
| system board |
| ......in card cage | 5-4, 6-4, 9-14, 10-19 |
| ......population |
| ............minimum | 5-2, 6-3 |
T
| |
| temperature specifications | 3-1, 3-7 |
| terminal concentrator |
| ......configuration | 11-1 |
| ......front panel and LEDs | 11-2 |
| |
| .....reboot | 11-5 |
| .....set |
| ............IP address | 11-4 |
| ............network address | 11-4 |
| ............subnet mask | 11-4 |
| .....setup verification | 11-6 |
| .....test button | 11-2 |
| test button, terminal concentrator | 11-2 |
| top panel, chassis remove | A-12 |
| turning off |
| .....SPARCcluster 1000HA | 7-1 |
| .....SPARCcluster 2000HA | 7-4 |
| turning on |
| .....SPARCcluster 1000HA | 7-3, 7-6 |
V
| |
| vented front panel | 8-2 |
| verifying |
| .....terminal concentratorconfiguration | 11-6 |
|