| |
| Figure 2-1 SPARCcluster High Availability Server Block Diagram Based on SPARCserver 1000 | 2-3 |
| Figure 2-2 SPARCcluster High Availability Server Block Diagram Based on SPARCcenter 2000 | 2-4 |
| Figure 2-3 Rack-mounted SPARCcluster 1000 High Availability Server Cabinet | 2-5 |
| Figure 2-4 SPARCcluster 2000 High Availability Cabinets | 2-6 |
| Figure 4-1 SPARCcluster 1000 High Availability System Floor Plan Example -- Minimum Configuration (Top View) | 4-2 |
| Figure 4-2 SPARCcluster 1000 High Availability System Floor Plan Example -- Maximum Configuration (Top View) | 4-2 |
| Figure 4-3 SPARCcluster 2000 High Availability System Floor Plan Example -- Minimum Configuration (Top View) | 4-3 |
| Figure 4-4 SPARCcluster 2000 High Availability System Floor Plan Example -- Maximum Configuration (Top View) | 4-3 |
| Figure 4-5 NEMA L6-30P Electrical Connector | 4-4 |
| Figure 4-6 IEC 309 Electrical Connector | 4-4 |
| Figure 4-7 Connecting Twisted Pair Ethernet to N-type Coaxial Cable | 4-9 |
| Figure 4-8 Ethernet Cabling Length -- Example Using N-type Cable | 4-10 |
| |
| Figure 4-9 Example of 10BASE-T (Twisted-Pair) Ethernet | 4-12 |
| Figure 5-1 SPARCcluster 1000 High Availability Model | 5-1 |
| Figure 5-2 Minimum Population -- System Boards and SBus Cards | 5-2 |
| Figure 5-3 Maximum Population -- System Boards | 5-4 |
| Figure 5-4 SPARCstorage Array Connection Example | 5-6 |
| Figure 5-5 SPARCcluster 1000 High Availability SPARCstorage Array, Maximum Configuration | 5-7 |
| Figure 6-1 Basic SPARCcluster 2000 High Availability System | 6-1 |
| Figure 6-2 Card Cage: Minimum Population | 6-3 |
| Figure 6-3 Maximum Population -- System Boards | 6-4 |
| Figure 6-4 SPARCstorage Array Connection Example | 6-6 |
| Figure 7-1 Key Switch Positions | 7-2 |
| Figure 7-2 AC Distribution Unit Power Switch | 7-3 |
| Figure 7-3 Key Switch Positions -- System Cabinet Front Panel | 7-5 |
| Figure 7-4 AC Distribution Unit Power Switch -- Rear of System Cabinet 7-6 |
| Figure 7-5 Local/Remote Switch Location | 7-7 |
| Figure 8-1 Opening the Hinged Door -- System Cabinet | 8-2 |
| Figure 8-2 Removing the Vented Panels | 8-3 |
| Figure 8-3 Rear Screen Panel Removal | 8-4 |
| Figure 8-4 Removing the Kick Panel | 8-5 |
| Figure 8-5 Stabilizer Bar | 8-6 |
| Figure 8-6 Main Leveling Pads | 8-7 |
| Figure 8-7 Stabilizer Bar Leveling Pads | 8-8 |
| Figure 8-8 Removing the Side Panels | 8-9 |
| Figure 9-1 Key Switch Positions | 9-1 |
| Figure 9-2 AC Distribution Unit Power Switch | 9-2 |
| |
| Figure 9-3 Key Switch Positions | 9-4 |
| Figure 9-4 AC Distribution Unit Power Switch | 9-5 |
| Figure 9-5 SPARCstorage Array Voltage Rating on the Serial Number Label | 9-6 |
| Figure 9-6 SPARCserver 1000 and SPARCstorage Array AC Power Connector and Power Switch | 9-8 |
| Figure 9-7 Plugging SPARCstorage Arrays/Terminal Concentrator into the Power Sequencer | 9-9 |
| Figure 9-8 Installing the Terminal Concentrator Hinge | 9-10 |
| Figure 9-9 Assembling the Terminal Concentrator Bracket | 9-11 |
| Figure 9-10 Terminal Concentrator Bracket Installed and Open | 9-12 |
| Figure 9-11 Terminal Concentrator Cable Locations | 9-12 |
| Figure 9-12 Minimum Configuration: System Boards Loaded with SBus Cards | 9-14 |
| Figure 9-13 Connecting the Administration Workstation | 9-16 |
| Figure 9-14 Connecting the Terminal Concentrator and Public Ethernet . 9-18 |
| Figure 9-15 Closing the Terminal Concentrator Bracket | 9-19 |
| Figure 9-16 Node-to-Node Sun private net Cable Connections | 9-20 |
| Figure 9-17 SPARCstorage Array 0, 1 and 2 Connection and Labeling Detail | 9-22 |
| Figure 9-18 SPARCstorage Array 3 and 4 Connection and Labeling Detail 9-23 |
| Figure 9-19 SPARCstorage Array 5 Connection Detail | 9-24 |
| Figure 9-20 SPARCstorage Array 6 and 7 Connection Detail | 9-25 |
| Figure 9-21 SPARCstorage Array Fiber Cable Connection | 9-26 |
| Figure 10-1 Key Switch in the Standby Position | 10-2 |
| Figure 10-2 Local/Remote Switch | 10-3 |
| Figure 10-3 AC Distribution Unit Power Switch | 10-4 |
| |
| Figure 10-4 SPARCstorage Array Voltage Rating on the Serial Number Label | 10-7 |
| Figure 10-5 SPARCstorage Array AC Power Connector | 10-8 |
| Figure 10-6 Plugging SPARCstorage Arrays into the Power Distribution Unit | 10-9 |
| Figure 10-7 Installing the Terminal Concentrator Hinge | 10-10 |
| Figure 10-8 Assembling the Terminal Concentrator Bracket | 10-11 |
| Figure 10-9 Terminal Concentrator Installed on the Hinge | 10-12 |
| Figure 10-10 Terminal Concentrator Cable Locations | 10-13 |
| Figure 10-11 Plugging the Terminal Concentrator and Boot Disk into the AC Power Distribution Unit | 10-13 |
| Figure 10-12 Installing the Boot Disk Hinge | 10-14 |
| Figure 10-13 Assembling the Boot Disk Bracket | 10-16 |
| Figure 10-14 Boot Disk Bracket Installed on the Hinge | 10-17 |
| Figure 10-15 Minimum Configuration: System Boards Loaded with SBus Cards | 10-19 |
| Figure 10-16 Connecting the Administration Workstation | 10-22 |
| Figure 10-17 Node Interface to the Terminal Concentrator | 10-23 |
| Figure 10-18 Node-to-Node Sun private net Cable Connections | 10-24 |
| Figure 10-19 Connecting the Boot Disks | 10-25 |
| Figure 10-20 Connecting the Internal SCSI Tray | 10-26 |
| Figure 10-21 SPARCstorage Array 0, 1 and 2 Connection and Labeling Detail | 10-27 |
| Figure 10-22 SPARCstorage Array Fiber Cable Connection | 10-28 |
| Figure 10-23 Suggested Labeling Scheme for Fiber Optic Cables | 10-29 |
| Figure 11-1 Terminal Concentrator Test Button | 11-2 |
| Figure 11-2 Determining the Terminal Concentrator Version | 11-7 |
| |
| Figure A-1 Installing the Air Baffle Assembly | A-2 |
| Figure A-2 Rack Mount Kit Side Rails and Base Plate | A-3 |
| Figure A-3 Side Rail Installation Locations and Hole Numbers in the SPARCcluster 1000 High Availability Node Cabinet | A-4 |
| Figure A-4 Side Rail Installation Locations and Hole Numbers in the SPARCcluster 2000 High Availability Primary Cabinet | A-5 |
| Figure A-5 Side Rail Installation Locations and Hole Numbers in the SPARCcluster 2000 High Availability Secondary Cabinet | A-6 |
| Figure A-6 Side Rail Installation Locations and Hole Numbers in the Expansion Cabinet | A-7 |
| Figure A-7 Threading Screws into the Rack -- Right Side Rail | A-8 |
| Figure A-8 Securing the Right Side Rail to the Rack | A-8 |
| Figure A-9 Securing the Left Side Rail to the Rack | A-9 |
| Figure A-10 Removing the Front Panel | A-10 |
| Figure A-11 Installing the Key Icon Label on the Server Chassis EMI Panel A-11 |
| Figure A-12 Removing the Side Panels | A-12 |
| Figure A-13 Removing the Popouts from the Top Panel | A-13 |
| Figure A-14 Removing the Top Panel | A-14 |
| Figure A-15 Replacing the Popouts in the Top Panel | A-14 |
| Figure A-16 Removing the Feet | A-15 |
| Figure A-17 Installing the Base Plate on the Chassis | A-16 |
| Figure A-18 Base Plate Installed | A-17 |
| Figure A-19 Installing the Chassis in the Cabinet | A-18 |
| Figure A-20 Aligning the Chassis/Base Plate with the Side Rails | A-19 |
| Figure A-21 Installing Screws to Secure the Base Plate to the Side Brackets A-20 |
| Figure A-22 Blower Assemblies -- Rear View | A-21 |