SPARCcluster HA Server Hardware Planning and Installation
只搜寻这本书
以 PDF 格式下载本书

............................Figures

Figure 2-1 SPARCcluster High Availability Server Block Diagram Based on SPARCserver 10002-3
Figure 2-2 SPARCcluster High Availability Server Block Diagram Based on SPARCcenter 20002-4
Figure 2-3 Rack-mounted SPARCcluster 1000 High Availability Server Cabinet2-5
Figure 2-4 SPARCcluster 2000 High Availability Cabinets2-6
Figure 4-1 SPARCcluster 1000 High Availability System Floor Plan Example -- Minimum Configuration (Top View)4-2
Figure 4-2 SPARCcluster 1000 High Availability System Floor Plan Example -- Maximum Configuration (Top View)4-2
Figure 4-3 SPARCcluster 2000 High Availability System Floor Plan Example -- Minimum Configuration (Top View)4-3
Figure 4-4 SPARCcluster 2000 High Availability System Floor Plan Example -- Maximum Configuration (Top View)4-3
Figure 4-5 NEMA L6-30P Electrical Connector4-4
Figure 4-6 IEC 309 Electrical Connector4-4
Figure 4-7 Connecting Twisted Pair Ethernet to N-type Coaxial Cable4-9
Figure 4-8 Ethernet Cabling Length -- Example Using N-type Cable4-10
Figure 4-9 Example of 10BASE-T (Twisted-Pair) Ethernet4-12
Figure 5-1 SPARCcluster 1000 High Availability Model5-1
Figure 5-2 Minimum Population -- System Boards and SBus Cards5-2
Figure 5-3 Maximum Population -- System Boards5-4
Figure 5-4 SPARCstorage Array Connection Example5-6
Figure 5-5 SPARCcluster 1000 High Availability SPARCstorage Array, Maximum Configuration5-7
Figure 6-1 Basic SPARCcluster 2000 High Availability System6-1
Figure 6-2 Card Cage: Minimum Population6-3
Figure 6-3 Maximum Population -- System Boards6-4
Figure 6-4 SPARCstorage Array Connection Example6-6
Figure 7-1 Key Switch Positions7-2
Figure 7-2 AC Distribution Unit Power Switch7-3
Figure 7-3 Key Switch Positions -- System Cabinet Front Panel7-5
Figure 7-4 AC Distribution Unit Power Switch -- Rear of System Cabinet 7-6
Figure 7-5 Local/Remote Switch Location7-7
Figure 8-1 Opening the Hinged Door -- System Cabinet8-2
Figure 8-2 Removing the Vented Panels8-3
Figure 8-3 Rear Screen Panel Removal8-4
Figure 8-4 Removing the Kick Panel8-5
Figure 8-5 Stabilizer Bar8-6
Figure 8-6 Main Leveling Pads8-7
Figure 8-7 Stabilizer Bar Leveling Pads8-8
Figure 8-8 Removing the Side Panels8-9
Figure 9-1 Key Switch Positions9-1
Figure 9-2 AC Distribution Unit Power Switch9-2
Figure 9-3 Key Switch Positions9-4
Figure 9-4 AC Distribution Unit Power Switch9-5
Figure 9-5 SPARCstorage Array Voltage Rating on the Serial Number Label9-6
Figure 9-6 SPARCserver 1000 and SPARCstorage Array AC Power Connector and Power Switch9-8
Figure 9-7 Plugging SPARCstorage Arrays/Terminal Concentrator into the Power Sequencer9-9
Figure 9-8 Installing the Terminal Concentrator Hinge9-10
Figure 9-9 Assembling the Terminal Concentrator Bracket9-11
Figure 9-10 Terminal Concentrator Bracket Installed and Open9-12
Figure 9-11 Terminal Concentrator Cable Locations9-12
Figure 9-12 Minimum Configuration: System Boards Loaded with SBus Cards9-14
Figure 9-13 Connecting the Administration Workstation9-16
Figure 9-14 Connecting the Terminal Concentrator and Public Ethernet . 9-18
Figure 9-15 Closing the Terminal Concentrator Bracket9-19
Figure 9-16 Node-to-Node Sun private net Cable Connections9-20
Figure 9-17 SPARCstorage Array 0, 1 and 2 Connection and Labeling Detail9-22
Figure 9-18 SPARCstorage Array 3 and 4 Connection and Labeling Detail 9-23
Figure 9-19 SPARCstorage Array 5 Connection Detail9-24
Figure 9-20 SPARCstorage Array 6 and 7 Connection Detail9-25
Figure 9-21 SPARCstorage Array Fiber Cable Connection9-26
Figure 10-1 Key Switch in the Standby Position10-2
Figure 10-2 Local/Remote Switch10-3
Figure 10-3 AC Distribution Unit Power Switch10-4
Figure 10-4 SPARCstorage Array Voltage Rating on the Serial Number Label10-7
Figure 10-5 SPARCstorage Array AC Power Connector10-8
Figure 10-6 Plugging SPARCstorage Arrays into the Power Distribution Unit10-9
Figure 10-7 Installing the Terminal Concentrator Hinge10-10
Figure 10-8 Assembling the Terminal Concentrator Bracket10-11
Figure 10-9 Terminal Concentrator Installed on the Hinge10-12
Figure 10-10 Terminal Concentrator Cable Locations10-13
Figure 10-11 Plugging the Terminal Concentrator and Boot Disk into the AC Power Distribution Unit10-13
Figure 10-12 Installing the Boot Disk Hinge10-14
Figure 10-13 Assembling the Boot Disk Bracket10-16
Figure 10-14 Boot Disk Bracket Installed on the Hinge10-17
Figure 10-15 Minimum Configuration: System Boards Loaded with SBus Cards10-19
Figure 10-16 Connecting the Administration Workstation10-22
Figure 10-17 Node Interface to the Terminal Concentrator10-23
Figure 10-18 Node-to-Node Sun private net Cable Connections10-24
Figure 10-19 Connecting the Boot Disks10-25
Figure 10-20 Connecting the Internal SCSI Tray10-26
Figure 10-21 SPARCstorage Array 0, 1 and 2 Connection and Labeling Detail10-27
Figure 10-22 SPARCstorage Array Fiber Cable Connection10-28
Figure 10-23 Suggested Labeling Scheme for Fiber Optic Cables10-29
Figure 11-1 Terminal Concentrator Test Button11-2
Figure 11-2 Determining the Terminal Concentrator Version11-7
Figure A-1 Installing the Air Baffle AssemblyA-2
Figure A-2 Rack Mount Kit Side Rails and Base PlateA-3
Figure A-3 Side Rail Installation Locations and Hole Numbers in the SPARCcluster 1000 High Availability Node CabinetA-4
Figure A-4 Side Rail Installation Locations and Hole Numbers in the SPARCcluster 2000 High Availability Primary CabinetA-5
Figure A-5 Side Rail Installation Locations and Hole Numbers in the SPARCcluster 2000 High Availability Secondary CabinetA-6
Figure A-6 Side Rail Installation Locations and Hole Numbers in the Expansion CabinetA-7
Figure A-7 Threading Screws into the Rack -- Right Side RailA-8
Figure A-8 Securing the Right Side Rail to the RackA-8
Figure A-9 Securing the Left Side Rail to the RackA-9
Figure A-10 Removing the Front PanelA-10
Figure A-11 Installing the Key Icon Label on the Server Chassis EMI Panel A-11
Figure A-12 Removing the Side PanelsA-12
Figure A-13 Removing the Popouts from the Top PanelA-13
Figure A-14 Removing the Top PanelA-14
Figure A-15 Replacing the Popouts in the Top PanelA-14
Figure A-16 Removing the FeetA-15
Figure A-17 Installing the Base Plate on the ChassisA-16
Figure A-18 Base Plate InstalledA-17
Figure A-19 Installing the Chassis in the CabinetA-18
Figure A-20 Aligning the Chassis/Base Plate with the Side RailsA-19
Figure A-21 Installing Screws to Secure the Base Plate to the Side Brackets A-20
Figure A-22 Blower Assemblies -- Rear ViewA-21
Figure A-23 Installing the Blower Assembly in the SPARCcluster 1000 High Availability and Expansion CabinetA-22
Figure A-24 Plugging the Blower Assembly into the Power SequencerA-24