SPARCcluster HA Server Hardware Planning and Installation
  Search only this book
Download this book in PDF

............................Contents


Part 1 --Site Preparation and Planning

1. Checklist
1-1
....1.1 SPARCcluster 1000 High Availability System-- Factory-
.......Assembled 1-2
......1.1.1 General Description 1-2
......1.1.2 Checklist 1-2
....1.2 SPARCcluster 1000 High Availability System-- Customer-
.......Assembled 1-3
......1.2.1 General Description 1-3
......1.2.2 Checklist 1-4
....1.3 SPARCcluster 2000 High Availability System -- Factory-
.......Assembled 1-5
......1.3.1 General Description 1-5
......1.3.2 Checklist 1-6
....1.4 SPARCcluster 2000 High Availability System -- Customer-
.......Assembled 1-7
......1.4.1 General Description 1-7
......1.4.2 Checklist 1-8

2. Product Description
2-1
....2.1 Features 2-2
....2.2 SPARCcluster 1000 High Availability Server Configuration2-5
....2.3 SPARCcluster 2000 High Availability Server Configuration2-6

3. Specifications
3-1
....3.1 Physical Specifications 3-1
......3.1.1 SPARCcluster 1000 High Availability 3-2
......3.1.2 SPARCcluster 2000 High Availability 3-3
......3.1.3 Expansion Cabinet 3-4
....3.2 Electrical Specifications 3-5
......3.2.1 SPARCcluster 1000 High Availability Server 3-5
......3.2.2 SPARCcluster 2000 High Availability Server 3-5
....3.3 Environmental Specifications 3-7

4. Site Preparation and Planning
4-1
....4.1 Planning Floor Space 4-1
......4.1.1 SPARCcluster 1000 High Availability System 4-1
......4.1.2 SPARCcluster 2000 High Availability System 4-2
....4.2 Power Requirements and Options 4-4
......4.2.1 Electrical Circuits Required 4-4
....4.3 Ethernet Networks 4-5
......4.3.1 Public Client Network 4-5
......4.3.2 Private Node-to-Node Network 4-5
......4.3.3 RS-232C/RS-423A 4-5
......4.3.4 Cable Requirements 4-6
....4.4 Coaxial Ethernet Cabling 4-8
......4.4.1 Ethernet Design Considerations 4-8
......4.4.2 Preparing the Ethernet Network 4-10

5. SPARCcluster 1000 High Availability Configurations
5-1
....5.1 Minimum Configuration 5-2
......5.1.1 System Board Population 5-2
......5.1.2 SBus Card Population 5-3
....5.2 Expansion 5-3
....5.3 Maximum Configuration 5-3
......5.3.1 System Board Population 5-3
......5.3.2 SBus Card Population 5-4
....5.4 System Component Cabling 5-4
......5.4.1 Administration Workstation 5-4
......5.4.2 Terminal Concentrator 5-5
......5.4.3 Public Net Ethernet 5-5
......5.4.4 Private Network Connecting Node 0 to Node 1 5-5
......5.4.5 SPARCstorage Arrays 5-5

6. SPARCcluster 2000 High Availability Configurations
6-1
....6.1 Minimum Configuration 6-2
......6.1.1 System Board Population in the Card Cage 6-2
......6.1.2 SBus Card Population 6-3
....6.2 Expansion 6-3
....6.3 Maximum Configuration 6-4
......6.3.1 System Board Population 6-4
......6.3.2 SBus Card Population 6-4
....6.4 System Component Cabling 6-5
......6.4.1 Administration Workstation 6-5
......6.4.2 Terminal Concentrator 6-5
......6.4.3 Public Net Ethernet 6-5
......6.4.4 Private Network Connecting Node 0 to Node 1 6-5
......6.4.5 Boot Disks 6-6
......6.4.6 SPARCstorage Arrays 6-6

Part 2 --Hardware Installation

7. Powering Off and On
7-1
....7.1 SPARCcluster 1000 High Availability Server 7-1
......7.1.1 Powering Off a Server (Node) 7-2
......7.1.2 Powering On a Server (Node) 7-3
....7.2 SPARCcluster 2000 High Availability Server 7-4
......7.2.1 Powering Off a Server (Node) 7-4
......7.2.2 Powering On a Server (Node) 7-6
....7.3 Powering On the Server/Storage Chassis 7-7
....7.4 Reading POST Messages and Boot Messages 7-8

8. Access
8-1
....8.1 Removing System and Expansion Cabinet Panels 8-1
......8.1.1 Opening the Hinged Door (SPARCcluster 2000 High
...........Availability) 8-2
......8.1.2 Vented Front Panels (SPARCcluster 2000 High
...........Availability or SPARCcluster 1000 High Availability) 8-2
......8.1.3 Rear Screen Panel 8-4
......8.1.4 Kick Panel 8-5
......8.1.5 Stabilizer Bar 8-5
....8.2 Leveling the Cabinets 8-6
....8.3 Side Panel Removal 8-8

9. SPARCcluster 1000 High Availability Hardware Installation
9-1
....9.1 Factory-Assembled SPARCcluster 1000 High Availability
.......Hardware 9-1
......9.1.1 Preparing the Cabinets 9-1
......9.1.2 Connecting the Power Cords 9-2
....9.2 Customer-Assembled SPARCcluster 1000 High Availability
.......Hardware 9-3
......9.2.1 Preparing the Cabinet 9-3
......9.2.2 Installing the Cabinet 9-4
......9.2.3 Connecting the Main AC Cord 9-4
......9.2.4 Installing the SPARCserver 1000 and SPARCstorage
...........Array Systems 9-6
......9.2.5 Installing the Terminal Concentrator 9-9
......9.2.6 Configuring the Card Cages 9-13
......9.2.7 Cabling the System Components 9-14
....9.3 Closing the Cabinet 9-28

10. SPARCcluster 2000 High Availability Server Hardware
...Installation 10-1
...10.1 Factory-Assembled SPARCcluster 2000 High Availability
.......Hardware 10-1
.....10.1.1 Preparing the Cabinets 10-1
.....10.1.2 Connecting the Power Cords 10-3
...10.2 Customer-Assembled SPARCcluster 2000 High Availability
.......Hardware 10-5
.....10.2.1 Preparing the Cabinet 10-5
.....10.2.2 Installing the Cabinets 10-5
.....10.2.3 Connecting the Main AC Cord 10-6
.....10.2.4 Installing SPARCstorage Arrays 10-6
.....10.2.5 Installing the Terminal Concentrator 10-9
.....10.2.6 Installing the Boot Disks 10-14
.....10.2.7 Configuring the Card Cages 10-18
.....10.2.8 Cabling System Components 10-19
...10.3 Closing the Cabinet 10-32

Part 3 --Software Installation

11. Installing the Software
11-1
...11.1 Configuring the Terminal Concentrator 11-1
...11.2 Checkpoint to Verify Terminal Concentrator Setup 11-6
...11.3 Setting the Port Parameters 11-7
......11.3.1 Determining if the Port Type Variable Must Be set. 11-7
......11.3.2 Port Parameters Procedure 11-8
...11.4 SPARCcluster Acceptance Test 11-9
......11.4.1 SunVTS 11-9
......11.4.2 Acceptance Test Criteria 11-15
...11.5 What's Next 11-15

Part 4 --Appendix and Index

A. Air Baffle, Rack Mount Rail and Blower Assembly InstallationA-
...................................................1
...A.1 Installing the Air Baffles A-1
......A.1.1 Side Baffle A-1
......A.1.2 Front Baffle A-2
...A.2 Rack Mount Rail Installation A-3
...A.3 Chassis Installation Positions A-4
......A.3.1 SPARCcluster 1000 High Availability Node CabinetsA-4
......A.3.2 SPARCcluster 2000 High Availability Node CabinetsA-5
......A.3.3 Expansion Cabinets A-7
...A.4 Installing the Side Rails A-7
...A.5 Preparing the Server and SPARCstorage Array Chassis . A-9
......A.5.1 Removing the Front Panel A-9
......A.5.2 Installing the Key Switch Position Label A-10
......A.5.3 Removing the Side Panels A-11
......A.5.4 Removing the Top Panel A-12
...A.6 Installing the Base Plate on the Server or
.......Disk Array Chassis A-16
...A.7 Installing the Chassis in the Cabinet A-17
...A.8 Installing the Blower Assemblies A-20