| |
Part 1 --Site Preparation and Planning |
1. Checklist | 1-1 |
| ....1.1 SPARCcluster 1000 High Availability System-- Factory- |
| .......Assembled | 1-2 |
| ......1.1.1 General Description | 1-2 |
| ......1.1.2 Checklist | 1-2 |
| ....1.2 SPARCcluster 1000 High Availability System-- Customer- |
| .......Assembled | 1-3 |
| ......1.2.1 General Description | 1-3 |
| ......1.2.2 Checklist | 1-4 |
| ....1.3 SPARCcluster 2000 High Availability System -- Factory- |
| .......Assembled | 1-5 |
| ......1.3.1 General Description | 1-5 |
| ......1.3.2 Checklist | 1-6 |
| ....1.4 SPARCcluster 2000 High Availability System -- Customer | - |
| .......Assembled | 1-7 |
| ......1.4.1 General Description | 1-7 |
| |
| ......1.4.2 Checklist | 1-8 |
2. Product Description | 2-1 |
| ....2.1 Features | 2-2 |
| ....2.2 SPARCcluster 1000 High Availability Server Configuration | 2-5 |
| ....2.3 SPARCcluster 2000 High Availability Server Configuration | 2-6 |
3. Specifications | 3-1 |
| ....3.1 Physical Specifications | 3-1 |
| ......3.1.1 SPARCcluster 1000 High Availability | 3-2 |
| ......3.1.2 SPARCcluster 2000 High Availability | 3-3 |
| ......3.1.3 Expansion Cabinet | 3-4 |
| ....3.2 Electrical Specifications | 3-5 |
| ......3.2.1 SPARCcluster 1000 High Availability Server | 3-5 |
| ......3.2.2 SPARCcluster 2000 High Availability Server | 3-5 |
| ....3.3 Environmental Specifications | 3-7 |
4. Site Preparation and Planning | 4-1 |
| ....4.1 Planning Floor Space | 4-1 |
| ......4.1.1 SPARCcluster 1000 High Availability System | 4-1 |
| ......4.1.2 SPARCcluster 2000 High Availability System | 4-2 |
| ....4.2 Power Requirements and Options | 4-4 |
| ......4.2.1 Electrical Circuits Required | 4-4 |
| ....4.3 Ethernet Networks | 4-5 |
| ......4.3.1 Public Client Network | 4-5 |
| ......4.3.2 Private Node-to-Node Network | 4-5 |
| ......4.3.3 RS-232C/RS-423A | 4-5 |
| |
| ......4.3.4 Cable Requirements | 4-6 |
| ....4.4 Coaxial Ethernet Cabling | 4-8 |
| ......4.4.1 Ethernet Design Considerations | 4-8 |
| ......4.4.2 Preparing the Ethernet Network | 4-10 |
5. SPARCcluster 1000 High Availability Configurations | 5-1 |
| ....5.1 Minimum Configuration | 5-2 |
| ......5.1.1 System Board Population | 5-2 |
| ......5.1.2 SBus Card Population | 5-3 |
| ....5.2 Expansion | 5-3 |
| ....5.3 Maximum Configuration | 5-3 |
| ......5.3.1 System Board Population | 5-3 |
| ......5.3.2 SBus Card Population | 5-4 |
| ....5.4 System Component Cabling | 5-4 |
| ......5.4.1 Administration Workstation | 5-4 |
| ......5.4.2 Terminal Concentrator | 5-5 |
| ......5.4.3 Public Net Ethernet | 5-5 |
| ......5.4.4 Private Network Connecting Node 0 to Node 1 | 5-5 |
| ......5.4.5 SPARCstorage Arrays | 5-5 |
6. SPARCcluster 2000 High Availability Configurations | 6-1 |
| ....6.1 Minimum Configuration | 6-2 |
| ......6.1.1 System Board Population in the Card Cage | 6-2 |
| ......6.1.2 SBus Card Population | 6-3 |
| ....6.2 Expansion | 6-3 |
| ....6.3 Maximum Configuration | 6-4 |
| |
| ......6.3.1 System Board Population | 6-4 |
| ......6.3.2 SBus Card Population | 6-4 |
| ....6.4 System Component Cabling | 6-5 |
| ......6.4.1 Administration Workstation | 6-5 |
| ......6.4.2 Terminal Concentrator | 6-5 |
| ......6.4.3 Public Net Ethernet | 6-5 |
| ......6.4.4 Private Network Connecting Node 0 to Node 1 | 6-5 |
| ......6.4.5 Boot Disks | 6-6 |
| ......6.4.6 SPARCstorage Arrays | 6-6 |
Part 2 --Hardware Installation |
7. Powering Off and On | 7-1 |
| ....7.1 SPARCcluster 1000 High Availability Server | 7-1 |
| ......7.1.1 Powering Off a Server (Node) | 7-2 |
| ......7.1.2 Powering On a Server (Node) | 7-3 |
| ....7.2 SPARCcluster 2000 High Availability Server | 7-4 |
| ......7.2.1 Powering Off a Server (Node) | 7-4 |
| ......7.2.2 Powering On a Server (Node) | 7-6 |
| ....7.3 Powering On the Server/Storage Chassis | 7-7 |
| ....7.4 Reading POST Messages and Boot Messages | 7-8 |
8. Access | 8-1 |
| ....8.1 Removing System and Expansion Cabinet Panels | 8-1 |
| ......8.1.1 Opening the Hinged Door (SPARCcluster 2000 High |
| ...........Availability) | 8-2 |
| ......8.1.2 Vented Front Panels (SPARCcluster 2000 High |
| ...........Availability or SPARCcluster 1000 High Availability) | 8-2 |
| |
| ......8.1.3 Rear Screen Panel | 8-4 |
| ......8.1.4 Kick Panel | 8-5 |
| ......8.1.5 Stabilizer Bar | 8-5 |
| ....8.2 Leveling the Cabinets | 8-6 |
| ....8.3 Side Panel Removal | 8-8 |
9. SPARCcluster 1000 High Availability Hardware Installation | 9-1 |
| ....9.1 Factory-Assembled SPARCcluster 1000 High Availability |
| .......Hardware | 9-1 |
| ......9.1.1 Preparing the Cabinets | 9-1 |
| ......9.1.2 Connecting the Power Cords | 9-2 |
| ....9.2 Customer-Assembled SPARCcluster 1000 High Availability |
| .......Hardware | 9-3 |
| ......9.2.1 Preparing the Cabinet | 9-3 |
| ......9.2.2 Installing the Cabinet | 9-4 |
| ......9.2.3 Connecting the Main AC Cord | 9-4 |
| ......9.2.4 Installing the SPARCserver 1000 and SPARCstorage |
| ...........Array Systems | 9-6 |
| ......9.2.5 Installing the Terminal Concentrator | 9-9 |
| ......9.2.6 Configuring the Card Cages | 9-13 |
| ......9.2.7 Cabling the System Components | 9-14 |
| ....9.3 Closing the Cabinet | 9-28 |
10. SPARCcluster 2000 High Availability Server Hardware |
| ...Installation | 10-1 |
| ...10.1 Factory-Assembled SPARCcluster 2000 High Availability |
| .......Hardware | 10-1 |
| .....10.1.1 Preparing the Cabinets | 10-1 |
| |
| .....10.1.2 Connecting the Power Cords | 10-3 |
| ...10.2 Customer-Assembled SPARCcluster 2000 High Availability |
| .......Hardware | 10-5 |
| .....10.2.1 Preparing the Cabinet | 10-5 |
| .....10.2.2 Installing the Cabinets | 10-5 |
| .....10.2.3 Connecting the Main AC Cord | 10-6 |
| .....10.2.4 Installing SPARCstorage Arrays | 10-6 |
| .....10.2.5 Installing the Terminal Concentrator | 10-9 |
| .....10.2.6 Installing the Boot Disks | 10-14 |
| .....10.2.7 Configuring the Card Cages | 10-18 |
| .....10.2.8 Cabling System Components | 10-19 |
| ...10.3 Closing the Cabinet | 10-32 |
Part 3 --Software Installation |
11. Installing the Software | 11-1 |
| ...11.1 Configuring the Terminal Concentrator | 11-1 |
| ...11.2 Checkpoint to Verify Terminal Concentrator Setup | 11-6 |
| ...11.3 Setting the Port Parameters | 11-7 |
| ......11.3.1 Determining if the Port Type Variable Must Be set. | 11-7 |
| ......11.3.2 Port Parameters Procedure | 11-8 |
| ...11.4 SPARCcluster Acceptance Test | 11-9 |
| ......11.4.1 SunVTS | 11-9 |
| ......11.4.2 Acceptance Test Criteria | 11-15 |
| ...11.5 What's Next | 11-15 |
Part 4 --Appendix and Index |
| |
A. Air Baffle, Rack Mount Rail and Blower Assembly InstallationA- |
| ...................................................1 |
| ...A.1 Installing the Air Baffles | A-1 |
| ......A.1.1 Side Baffle | A-1 |
| ......A.1.2 Front Baffle | A-2 |
| ...A.2 Rack Mount Rail Installation | A-3 |
| ...A.3 Chassis Installation Positions | A-4 |
| ......A.3.1 SPARCcluster 1000 High Availability Node Cabinets | A-4 |
| ......A.3.2 SPARCcluster 2000 High Availability Node Cabinets | A-5 |
| ......A.3.3 Expansion Cabinets | A-7 |
| ...A.4 Installing the Side Rails | A-7 |
| ...A.5 Preparing the Server and SPARCstorage Array Chassis . | A-9 |
| ......A.5.1 Removing the Front Panel | A-9 |
| ......A.5.2 Installing the Key Switch Position Label | A-10 |
| ......A.5.3 Removing the Side Panels | A-11 |
| ......A.5.4 Removing the Top Panel | A-12 |
| ...A.6 Installing the Base Plate on the Server or |
| .......Disk Array Chassis | A-16 |
| ...A.7 Installing the Chassis in the Cabinet | A-17 |
| ...A.8 Installing the Blower Assemblies | A-20 |